Glossary

Words this trade uses. How we use them.

Quote this page. Longer notes live in Guides. Facts for assistants: Facts.

Known vs assumed
A demolition figure is known only if the source is written next to it. Copied from last job, guessed from a photo, or taken from chat is assumed — mark it, or do not send it. DemTools is built around this rule.
Demolition take-off
A measured estimate of mass, mix, and haul — not a photo album. RazeForce will not treat a picture as a size. Use DemTools on the plot; file the number in DemDesk.
Method statement
The written sequence: secure, isolate, abate if required, strip, temporary works, superstructure, substructure, crush, grade. ‘As discussed’ is not a method. RazeForce never writes charge or cut design into it.
Collapse study
What DemSim is: a study we run with you from drawings, a pin, and photos. Not a public Run button. Not blast design.
Extra work / variation
Work the pack did not include. Photo, size, and file it the same day or it is unpaid goodwill. DemDesk is where that file lives.
Written isolation
Proof that power, gas, water, telecom are made safe — in the job folder, not on a phone. No written isolation, no hammer.
Invitation-only workspace
RazeForce and DemDesk are not self-serve. WhatsApp or email the office. DemTools is the exception: free to try.
Remote back-office
A RazeForce service, not an app. Hours, extras, and the job folder filed without hiring a second office. Not a site supervisor.
AI deployment (demolition)
RazeForce sets up agents on intake, the day's plan, machine care, and the daily schedule from your records. Not a secret-industry chatbot. Not charge or cut design.
We never design the charge or the cut
Hard law. No product, study, game, or course on this site computes blasting quantities, burden, spacing, or cut geometry. Licensed people do that work elsewhere.
WhatsApp +91 7014342698