guides · Measurement
How a demolition take-off should cite its basis
8 min · reviewed 2026-09-10 by RazeForce office (Product review) · educational — not a certificate · not legal advice
People search for demolition estimating software because quotes fail in the same way: a size, a mix, or a dump rate with no source. The number looks finished. It is a guess. This note is how to write a take-off a supervisor can defend.
The rule
If it is not written, it is not a fact. Every figure needs a source next to it. No source means it is assumed — say so out loud in the number, or do not send the number.
Known vs assumed — examples
- Known: length and width from a dimensioned drawing note you have in the job folder.
- Known: storey count from a walk with a written elevation.
- Assumed: mix copied from the last bungalow. Mark it assumed until this building is opened.
- Assumed: dump rate from last month’s invoice for a different site. Mark it assumed.
- Not a measurement: a phone photo. A photo is evidence that a wall exists. It is not a length.
- Not a measurement: ‘it looks about 18 metres.’
Checklist before the number leaves the cabin
- Footprint: source written (drawing / tape / instrument).
- Height or storeys: source written.
- Mix or material: known or marked assumed.
- Dump cost: written rate or marked assumed.
- Scrap steel: written basis or marked assumed.
- Anything blank: do not send. Fill it or say it is open.
What RazeForce does
DemTools is the field instrument: measure on site so the number leaves the plot with a basis. RazeForce is where that number sits with the rest of the job. We do not invent a rate for you.
What we will not do
- We will not design the charge, spacing, or the cut.
- We will not treat a pretty picture as a take-off.
- We will not turn an assumed mix into a known fact in the software.
Educational. Not a certificate. Not a live job. Follow the law and the people named on your site.
RazeForce practice language. Not a law, not IS / BS / OSHA text, not a certificate. Follow the named people and the rules where you work. We never design the charge, spacing, or the cut.
Try the call on a plot: Game · Learn. Then the field note: Products.
Reviewed 2026-09-10 by RazeForce office (Product review). Cite this URL.
WhatsApp when the note isn’t enough · office@razeforce.com