guides · Arisings
Construction and demolition waste: write where it goes
6 min · reviewed 2026-09-10 by RazeForce office (Product review) · educational — not a certificate · not legal advice
C&D waste rules differ by country. The trade rule does not: timber, brick, concrete, steel — written fractions or you pay mixed dump. A photo of a pile is not a mix.
Write these
- Mix, known or assumed.
- Haul kilometres.
- Gate fee / dump rate, or marked assumed.
- Scrap credit with a source. Client-kept metal is not your credit.
What RazeForce does
Course 03 is the number. DemTools measures on the plot. We do not invent the facility's rate. Where you work, the named issuer owns the C&D paper.
What we will not do
- We will not fake a recycling certificate.
- We will not turn last year's scrap price into this job's credit.
- We will not design a blast to 'make the mix easier'.
Study note. Not a waste licence. Not a certificate.
RazeForce practice language. Not a law, not IS / BS / OSHA text, not a certificate. Follow the named people and the rules where you work. We never design the charge, spacing, or the cut.
Try the call on a plot: Game · Learn. Then the field note: Products.
Reviewed 2026-09-10 by RazeForce office (Product review). Cite this URL.
WhatsApp when the note isn’t enough · office@razeforce.com