skills · point
Structural engineering
NPTEL and a competent engineer. DemSim is a study we run with you, not a teaching solver.
Study notes. Not a certificate. Not a licence. Not NEBOSH, PESO, ISEE, or IDE. We never design the charge, spacing, or the cut. Site hours and statutory papers have no video substitute.
Load paths — the skill of tracing every load to the ground by eye, on a real building.
Trace every load to the ground by eye. If you cannot, you do not have a method.
16 h · point
Structural systems: moment frame, braced frame, shear wall, core, bearing wall, shell, arch.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
18 h · point
Reinforced concrete behaviour — cracking, reinforcement, bond, ductility.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
20 h · point
RC design to code (limit state) — enough to *read* a design, not to author one.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
20 h · point
Steel structures — connections, members, stability.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
18 h · point
Masonry and bearing-wall structures.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
14 h · point
Prestressed and post-tensioned concrete. Flag this hard: PT is the most dangerous thing in a demolition. Stored energy, no visible warning.
PT is a hold. Storey tendons. A licensed engineer. We do not cut a tendon from a note on this site.
22 h · point
Reading structural drawings and rebar schedules; mark systems (C1, B2…).
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
16 h · point
Pre-demolition structural appraisal — the survey that decides the method.
The survey that decides the method. Known vs assumed on paper.
20 h · point
Material testing and assessment of existing structures — rebound hammer, cores, cover meter, carbonation.
Count what you measured. Do not invent a carbon number.
14 h · point
Structural dynamics — SDOF, MDOF, natural frequency, damping, response.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
22 h · point
Collapse mechanisms and plastic hinges — where a structure *wants* to fold.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
22 h · point
Progressive and disproportionate collapse — alternate load path, tie force, notional removal.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
18 h · point
Temporary works and propping — holding up what you have not yet taken down.
Holding up what you have not yet taken down. Named designer. We do not issue the ticket.
20 h · point
