skills · point

Structural engineering

NPTEL and a competent engineer. DemSim is a study we run with you, not a teaching solver.

Study notes. Not a certificate. Not a licence. Not NEBOSH, PESO, ISEE, or IDE. We never design the charge, spacing, or the cut. Site hours and statutory papers have no video substitute.

  1. Load paths — the skill of tracing every load to the ground by eye, on a real building.

    Trace every load to the ground by eye. If you cannot, you do not have a method.

    16 h · point

  2. Structural systems: moment frame, braced frame, shear wall, core, bearing wall, shell, arch.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    18 h · point

  3. Reinforced concrete behaviour — cracking, reinforcement, bond, ductility.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    20 h · point

  4. RC design to code (limit state) — enough to *read* a design, not to author one.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    20 h · point

  5. Steel structures — connections, members, stability.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    18 h · point

  6. Masonry and bearing-wall structures.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    14 h · point

  7. Prestressed and post-tensioned concrete. Flag this hard: PT is the most dangerous thing in a demolition. Stored energy, no visible warning.

    PT is a hold. Storey tendons. A licensed engineer. We do not cut a tendon from a note on this site.

    22 h · point

  8. Reading structural drawings and rebar schedules; mark systems (C1, B2…).

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    16 h · point

  9. Pre-demolition structural appraisal — the survey that decides the method.

    The survey that decides the method. Known vs assumed on paper.

    20 h · point

  10. Material testing and assessment of existing structures — rebound hammer, cores, cover meter, carbonation.

    Count what you measured. Do not invent a carbon number.

    14 h · point

  11. Structural dynamics — SDOF, MDOF, natural frequency, damping, response.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    22 h · point

  12. Collapse mechanisms and plastic hinges — where a structure *wants* to fold.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    22 h · point

  13. Progressive and disproportionate collapse — alternate load path, tie force, notional removal.

    Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.

    18 h · point

  14. Temporary works and propping — holding up what you have not yet taken down.

    Holding up what you have not yet taken down. Named designer. We do not issue the ticket.

    20 h · point