Ground
Soil is a site fact. We do not invent it.
Study notes. Not a certificate. Not a licence. Not NEBOSH, PESO, ISEE, or IDE. We never design the charge, spacing, or the cut. Site hours and statutory papers have no video substitute.
Soil classification, index properties, site investigation reading.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
10 h · point
Bearing capacity and settlement — what your 80 t machine is standing on.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
12 h · point
Foundations: pad, raft, pile — and how each behaves when the superstructure lands.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
10 h · point
Retaining structures and excavation stability.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
10 h · point
Ground response to impact — how debris energy propagates, and why soil type dominates measured vibration.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
12 h · point
Rock mechanics basics — joints, bedding, strength, drillability.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
10 h · point
Groundwater, dewatering, contamination pathways.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
6 h · point