Rigging & temporary works
Named competent person. We do not issue a lifting ticket.
Study notes. Not a certificate. Not a licence. Not NEBOSH, PESO, ISEE, or IDE. We never design the charge, spacing, or the cut. Site hours and statutory papers have no video substitute.
Sling angles, load factors, centre of gravity of awkward loads.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
8 h · point
Wire rope, chain, synthetic slings — capacities, inspection, discard criteria.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
6 h · point
Shackles, hooks, spreader beams, below-the-hook devices.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
6 h · point
Crane types, load charts, ground preparation, lift planning.
Load chart, reach, mats. Ground that held last week may not hold 80 t today.
8 h · point
Pull-down techniques — cable/wire rope pulls, anchor design, the machine capacity that actually applies.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
8 h · point
Propping, shoring, needling, façade retention.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
8 h · point
Exclusion zones for lifting and for line-of-pull failure.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
3 h · point
Lift plans and appointed-person responsibilities.
Write what is known vs assumed for this item on this job. If you cannot, do not send the number or the method.
3 h · point