skills · teach
Safety & law
Written proof power is safe. Permits. Risk on paper. NEBOSH is theirs to issue.
Study notes. Not a certificate. Not a licence. Not NEBOSH, PESO, ISEE, or IDE. We never design the charge, spacing, or the cut. Site hours and statutory papers have no video substitute.
Hazard vs risk; risk assessment method; hierarchy of control.
Name the hazard. Then likelihood times consequence in this method. PPE last.
10 h · teach
PPE, exclusion zones, permit-to-work, lock-out/tag-out.
Permit, LOTO, exclusion — written. A helmet photo is not a permit.
8 h · teach
Working at height, confined space, hot work, services isolation.
Named system. Isolation of services is written proof or the work does not start.
10 h · teach
Incident investigation and root cause (5-why, fishbone, causal tree).
Name a system, not a person to blame. File it. Change the method.
8 h · teach
Safety management systems — ISO 45001 structure.
A system is paper that matches the week. We do not sell a badge.
8 h · teach
Statutory duties: who is competent, who is responsible, what "competent person" means legally.
Competent person is a legal meaning. Name them.
8 h · teach
Emergency planning, rescue, first aid, media-day incident response.
Rescue, first aid, who calls whom. The operator is not the spokesperson.
8 h · teach
Behavioural safety and toolbox talks that people actually listen to.
A talk people can repeat. Three facts. One stop signal.
6 h · teach
Audit and inspection regimes.
Inspect what you wrote. DemDesk is the folder, not the inbox.
4 h · teach
