skills · teach
Method & client
A method statement is not a brochure. Course 01 ends here.
Study notes. Not a certificate. Not a licence. Not NEBOSH, PESO, ISEE, or IDE. We never design the charge, spacing, or the cut. Site hours and statutory papers have no video substitute.
The method statement as a document: structure, evidence, what a competent person signs.
Competent person is a legal meaning. Name them.
8 h · teach
Explaining risk to a non-technical client without either terrifying or falsely reassuring them.
One sentence the client can repeat. No theatre. No false calm.
6 h · teach
Neighbour and community engagement before a blast.
Before the first hit. Limit, hours, a name they can call.
5 h · teach
Working with the client's structural engineer as a peer.
Bring facts. Not a pretty clip.
5 h · teach
Regulator and inspector relationships.
The folder is ready. Charm is not a control.
4 h · teach
Media handling on a blast day — and on an incident day.
One named voice. Facts.
4 h · teach
Visual communication: plans, 3D, simulation, video. This is your differentiator; most competitors show a sketch.
A plan and a study we ran — not a cinematic collapse as a method.
5 h · teach
Writing that survives a dispute: contemporaneous, factual, dated, no adjectives.
Dated, factual, no adjectives. DemDesk, same day.
3 h · teach
