where · UK
United Kingdom
CDM, a demolition method in the construction-phase plan, BS 6187 as the practice document people name. CCDO / NFDC tickets are theirs. We host the discipline, not the ticket.
Paper people actually ask for
- Method statement after a risk assessment — in the plan, not in chat.
- Pre-demolition / refurbishment survey for asbestos — licensed route.
- Service disconnection written.
- Neighbour vibration and hours as the contract and the local authority ask.
Named issuers
- HSE (CDM).
- Local authority building control / planning as they apply.
- UKATA / licensed asbestos contractor.
- NFDC / CCDO plant and operative tickets.
Not us
- We are not BS 6187.
- We do not issue CCDO or CSCS.
Method statement guide, then block M.
