academy · course 01
Course 01 — The written job
Six lessons. You read. Sign in to tick. Not a certificate. The game is a different page.
Study notes. Not a certificate. Not a licence. Not NEBOSH, PESO, ISEE, or IDE. We never design the charge, spacing, or the cut. Site hours and statutory papers have no video substitute.
Lesson 1 · 25 min
If it is not written, it is not a fact
A take-off that looks finished and has no source is a guess. Course 01 starts here because every later fight on a job is a missing source.
- Every figure has a source or is marked assumed.
- A phone photo is not a length.
- Blank dump or scrap lines do not leave the cabin.
Lesson 2 · 15 min
Power is not a sentence
‘He said it is off’ is not written proof that services are made safe. Looking at the board is still not that document.
- Written isolation in the job folder, or the machine does not start.
Lesson 3 · 20 min
Neighbours need a number
Quiet is not a control. Distance in metres is not a plan. Write the vibration limit before the first hit.
- Who is next door is written.
- The limit is written, or work does not start.
Lesson 4 · 20 min
Possible asbestos stays possible
An owner saying foam is not a test. Stop. Keep people out. File the hold.
- Hold written.
- Test asked for in writing.
- No work in that room until a result is filed.
Lesson 5 · 15 min
Extra work needs a photo and a size on the day
Goodwill at month end is unpaid work. Photograph it, measure it, file it the same day.
- Photo in the job folder.
- Size written.
- Proposed, then confirmed.
Lesson 6 · 40 min
Prove the judgement — then write the method
The method statement is the same rule in a document a competent person can sign. We still do not design the charge or the cut. The game (separate page) is practice of the same calls — not this lesson.
- Sequence, known vs assumed, make-safe, neighbour limit, arisings — written or do not claim you have a method.
