Basic surveying — levels, total station, coordinate systems, control.
~8 h study · original notes on this site
Basic surveying — levels, total station, coordinate systems, control.
Control first. A floating tape is an assumed length. Write the instrument.
Every figure cites its basis. That instrument is DemTools.
Produce an artefact before you tick: a written note, a marked drawing, a cited figure, a filed hold. Watching is learning. The tick means applied.
Study notes. Not a certificate. Not legal advice. We never design the charge, spacing, or the cut. Follow the law and the named people where you work.
Before you tick
- Source written next to every figure.
- CRS named.
- Photo not used as a length.
Every figure cites its basis. That instrument is DemTools.